Box I.2 cb/s-goldstein goin parameter information
line number
¯¯
Simulation start year [REAL];
15 0.0
Simulation run length (yr) [REAL];
16 2000.0
Simulation time scale as years Before Present? [T/F t/f];
17 f
Over-ride goldstein time control? [T/F t/f];
18 t
[REDUNDANT; retained for backwards compatibility];
19 *
include biogem pCO2 in EMBM radiative forcing (y/n);
20 n